-
I have an established site, and would like to bulk edit posts, to include the deep internal linking.
but walking through every post is taking too long..
Is there a batch mode process to apply the internal links to all previous posts?ideally rotating through the target links…
ie if there are 15 links for the term ‘New Years Eve’, and 45 posts that mention ‘New years Eve’, after the batch has run, each of the 15 links would have been applied 3 times… rather than all 45 posts having first link ‘new years eve’.thanks for your consideration
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
The ticket ‘Batch Bulk Edit – Internal Linking’ is closed to new replies.